A 2.0-kg mass is projected vertically upward from ground level with an initial speed of 30 m/s. The mass rises to a maximum height of 35 m above ground level. How much work is done on the mass by air resistance between the point of projection and the point of maximum height?

A 2.0-kg mass is projected vertically upward from ground level with an initial speed of 30 m/s. The mass rises to a maximum height of 35 m above ground level. How much work is done on the mass by air resistance between the point of projection and the point of maximum height?




1) -0.21 kJ
2) -0.47 kJ
3) -0.40 kJ
4) -0.34 kJ
5) -0.69 kJ








Answer: 1


Learn More :